As a supplier of -70℃ adsorption dryers, I understand the importance of a correct installation process. A well - installed dryer not only ensures optimal performance but also extends the equipment's lifespan. In this blog, I'll guide you through the step - by - step process of correctly installing a -70℃ adsorption dryer.
Pre - installation Preparations
Site Selection
The first step in the installation process is choosing an appropriate site. The area should be well - ventilated to prevent the build - up of heat generated by the dryer during operation. It should also be a clean environment, free from excessive dust and debris, as these particles can clog the dryer's internal components. Moreover, the site should have a stable and level surface to avoid any vibrations that could potentially damage the dryer.
Power Supply Check
Ensure that the power supply at the installation site meets the dryer's requirements. Check the voltage, frequency, and phase of the power source. Any discrepancies can lead to malfunction or even damage to the dryer. It is advisable to have a professional electrician verify the power supply to guarantee safety and proper operation.
Inlet and Outlet Piping Preparation
Measure and cut the inlet and outlet pipes according to the dryer's specifications. The pipes should be of the correct diameter to ensure smooth airflow. Use high - quality pipes that can withstand the pressure and temperature conditions of the dryer. Additionally, make sure to clean the pipes thoroughly before installation to remove any dirt or contaminants.
Installation Steps
Unpacking and Inspection
Carefully unpack the -70℃ adsorption dryer and inspect all the components for any visible damage during transit. Check the desiccant beds, valves, control panels, and other parts. If you find any damaged items, contact the supplier immediately for replacement. This inspection is crucial as it helps to identify and resolve any issues before the installation process begins.
Mounting the Dryer
Place the dryer on the pre - selected and prepared site. Use appropriate lifting equipment to move the dryer safely into position. Once in place, secure the dryer to the floor using bolts or other suitable fastening methods. Make sure the dryer is level and stable. A misaligned dryer can cause uneven wear on the components and affect its performance.
Connecting the Inlet and Outlet Pipes
Connect the inlet pipe to the dryer's air intake port and the outlet pipe to the air discharge port. Use proper pipe fittings and seals to ensure a leak - free connection. Tighten the fittings securely, but be careful not to over - tighten as this can damage the pipes or fittings. It is recommended to use a torque wrench to achieve the correct tightening torque.


Electrical Connection
Connect the dryer to the power supply according to the electrical wiring diagram provided in the user manual. Ensure that all the electrical connections are secure and properly insulated. Install a suitable circuit breaker or fuse to protect the dryer from electrical overloads. It is highly advisable to have a qualified electrician perform the electrical connection to comply with safety regulations.
Control Panel Setup
Set up the control panel of the -70℃ adsorption dryer. Follow the instructions in the user manual to configure the operating parameters such as regeneration time, dew point control, and alarm settings. The control panel is the brain of the dryer, and proper setup is essential for its efficient operation.
Post - installation Checks
Leak Test
After the installation is complete, conduct a leak test on all the pipe connections and valves. Use a soapy water solution to check for any air leaks. If you see bubbles forming at a connection point, it indicates a leak. Tighten the connection or replace the seal as necessary until all leaks are eliminated.
Functional Test
Power on the dryer and perform a functional test. Observe the dryer's operation, including the airflow, regeneration cycle, and control panel functions. Check the dew point of the dried air to ensure that it meets the required specifications. If there are any abnormal noises, vibrations, or performance issues, stop the dryer immediately and troubleshoot the problem.
Maintenance and Safety Checks
Inspect the dryer's safety features such as Compressor Safety Valve. Ensure that the safety valve is working correctly and is set to the appropriate pressure. Also, check other components like Compressor Belt and Pressure Reducing Valve for proper installation and functionality. Regular maintenance checks are essential to keep the dryer in good working condition.
Importance of Correct Installation
A correctly installed -70℃ adsorption dryer offers several benefits. Firstly, it ensures a consistent and reliable supply of dry air, which is crucial for many industrial processes. Secondly, it reduces the risk of breakdowns and costly repairs, thereby saving time and money in the long run. Thirdly, proper installation helps to maintain the dryer's energy efficiency, reducing energy consumption and operating costs.
Conclusion
Installing a -70℃ adsorption dryer correctly is a complex but essential process. By following the steps outlined in this blog, you can ensure that your dryer is installed safely and operates efficiently. If you have any questions or need further assistance during the installation process, don't hesitate to contact us. We are a professional -70℃ adsorption dryer supplier, and we are committed to providing you with the best products and services. Whether you are in the planning stage of a new installation or need to replace an existing dryer, we can offer you the right solutions. Contact us today to start a procurement negotiation and find the perfect -70℃ adsorption dryer for your needs.